Loading...

Optimization of Work-in-Progress Inventory of Bottleneck Pro

The manufacturing of motor vehicle involves series of processes starting from welding steel sheets to form a welded body, painting and assembling sequentially to finally give it a sellable form. The nature and the intricacy involved in each processes determine the rate of production. Also, factors s...

Full description

Bibliographic Details
Main Author: Mani, S G
Format: Article
Language:English
Published: 2014
Subjects:
LEADER 01319nab a22001937a 4500
008 160615b2014 xxu||||| |||| 00| 0 eng d
100 |a Mani, S G 
245 |a Optimization of Work-in-Progress Inventory of Bottleneck Pro  |c A Case Study of Passenger Car Industry / Mani, S G. 
260 |c 2014 
300 |a 49S - 59S 
520 |a The manufacturing of motor vehicle involves series of processes starting from welding steel sheets to form a welded body, painting and assembling sequentially to finally give it a sellable form. The nature and the intricacy involved in each processes determine the rate of production. Also, factors such as machine/equipment breakdowns result in alteration of the production rates further affecting the smooth manufacturing flow. This case study discusses how mismatches in the production rates (designed and altered) in a high-speed conveyors of various processes (starvation/blockages) could be minimized by ensuring optimized buffer storages by building WIP and minimizing risk of demand loss and optimizing inventory costs keeping the productivity also into consideration. 
650 |a Probability 
650 |a Buffer 
650 |a Blockage 
650 |a Starvation 
650 |a Energy Cost 
650 |a Work-In-Progress 
773 |a Global Business Review  |d December 
999 |c 42415  |d 42415